It is my understanding that on the approved planning layout the kerbing from the two new accesses tie in with the existing edge of carriageway position and as such I believe, after ‘scrapping’ back the edge of the road on Friday with the site manager present, the 350mm measurement referred to you is correct. For sake of clarity, I believe only one of the kerb `tie ins’ so far installed there is incorrect (that is, protruding into the carriageway and narrowing BFL) and again I base my assumption following my inspection there last Friday.
Regards Paul Johnston