DWH: Curb Stones on the Entrance to the David Wilson Site

It is my understanding that on the approved planning layout the kerbing from the two new accesses tie in with the existing edge of carriageway position and as such I believe, after ‘scrapping’ back the edge of the road on Friday with the site manager present, the 350mm measurement referred to you is correct. For sake of clarity, I believe only one of the kerb `tie ins’ so far installed there is incorrect (that is, protruding into the carriageway and narrowing BFL) and again I base my assumption following my inspection there last Friday.

Regards Paul Johnston

Paul Johnston
Development Engineer
Cheshire East Council